JANUARY 07 to OCTOBER 07 ABERDULAIS TO BRECON 48” PIPELINE PHASE 2
Prefabrication and on site mechanical Installation of 1 AGI, 1 Multi function AGI, Block Valve and 2 Offtakes, utilising the following welding Processes:
Surface Tension Transfer (STT) Root
Semi Auto Flux Cored Arc Welding (FCAW)
Fill and Cap Fully Automatic Flux Cored Arc Welding