22" x 16.8mm wt High Utility API 5L Grade X65 pipeline. Welded using Semi-automatic STT, Semi-automatic FCAW and Automatic FCAW with the Lincoln Electric Autoweld" System.
The onshore pipe provides the link between the offshore Magnus field in the North Sea and the tank farm at the Sullom Voe Terminal on the Shetland Isles. The actual distance between the shoreline and the tanks is approximately 300 metres, however, the onshore pipeline was 1.2Km in length because of the need to bypass an area of contaminated land. The development of the Clair field has an anticipated 15-year oil reserve.
BS 4515 2000 and bp JPK specification
Lawrence
Repair Rate <1%
Low Hydrogen Technology
Return to Clients & Projects >